Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace Structures 0/1 to 2/7 on its West Portal-Stillwater Tap …
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, B3.1, National Renewable Energy Office, Location(s): CO, Office(s): Golden Field Office
Evaluate uranium concentrations in the alluvial groundwater downstream of the northern institutional control boundary of the Naturita, Colorado, Ur…
Install aerial survey quality control monuments for aerial survey activities at the Slick Rock, Colorado, Uranium Mill Tailings Radiation Control A…
Delivering Clean Air in Denver. Propane Trucks and Infrastructure in Mail Delivery Application…
Plug and abandon well USBM/AEC CCH-3 and reclaim the site well pad and access road at the Bronco, Colorado, Site…
Construct eleven permanent aerial survey quality control monuments at the Grand Junction, Colorado, Uranium Mill Tailings Radiation Control Act Tit…
Conduct investigative and geotechnical activities in support of improvements and new construction for the Building 7 parcel project north of the le…
DOE, Office of Legacy Management, proposes to plug and abandon well USBM-AEC CCH No. 3 and reclaim the site well pad and access road at the Bronco,…
DOE LM is proposing to construct eleven permanent aerial survey quality control monuments at the Grand Junction, Colorado, Uranium Mill Tailings Ra…