Western Area Power Administration (WAPA), Colorado River Storage Project (CRSP) region proposes new formula rates for the Colorado River Storage Project transmission and ancillary services for CRSP’s costs to be recovered under the Southwest Power Pool’s (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP.
Funding will support the project's small-scale research and development of a proof-of-concept prototype multifunctional heat pump for heating and c…
Funding will support the project's small-scale research and development of a new recycling process for mixed, variable bio-based polyester waste st…
Funding will support the project team's small-scale research and development of a lignin-based concrete from waste biomass as a reduced-cost, lower…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Canon West – Mid…
Reconductor existing overhead lines at river crossings, replacing bare conductor with covered conductor. In some locations will convert from under…
The project scope includes replacing approximately five circuit miles of outdated copper powerline conductor with new aluminum conductor. This proj…
Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…