Using Solid Particles as Heat Transfer Fluid for Use in Concentrating Solar Power (CSP) Plants CX(s) Applied: A9 Date: 12/04/2012 Location(s): Colorado Offices(s): Golden Field Office
Combined Heat and Power Technical Assistance Partnerships CX(s) Applied: A9, A11 Date: 11/28/2012 Location(s): Colorado Offices(s): Golden Field Office
In-Situ X-Ray Analysis of Rapid Thermal Processing for Thin-Fil Solar Cells CX(s) Applied: A9, B1.31, B3.6 Date: 11/21/2012 Location(s): California, Colorado Offices(s): Golden Field Office
Liquid-Rich Shale Potential of Utah’s Uinta and Paradox Basins: Reservoir Characterization CX(s) Applied: B3.6 Date: 11/15/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
10 Megawatt Supercritical Carbon Dioxide Turbine Test CX(s) Applied: A9, B5.15 Date: 10/30/2012 Location(s): Colorado, Missouri, Ohio, New York, New York Offices(s): Golden Field Office
Artesia-Rangely Tap of the Hayden-Vernal 138 Kilovolt Transmission Line Bank Stabilization on Structure 20/2 CX(s) Applied: B1.3 Date: 10/29/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Granby (Farr) Pumping Plant Nest Removal Project CX(s) Applied: B1.3 Date: 10/03/2012 Location(s): Colorado Offices(s): Western Area Power Administration
Curecanti-Rifle 230 Kilovolt Transmission Line Sullivan Ranch Irrigation Water Pipeline Project Between Structures 25/5 to 26/1 CX(s) Applied: B4.9 Date: 09/28/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Reg...
High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, A11, B3.6 Date: 09/20/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Willow Creek - Granby Tap 2.4 Kilovolt Distribution Line Structure 0/3A Pole Replacement Project CX(s) Applied: B4.6 Date: 09/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region