Danger Tree Management on Curecanti to North Fork 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Curecanti- Lost Canyon 230 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mounta...
Hesperus-Montrose 345 Kilovolt and Curecanti-Lost Canyon 230 Kilovolt Transmission Lines Vegetation Management San Miguel and Dolores Counties CX(s) Applied: B1.3Date: 09/13/2012 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky ...
(0675 -1537) Utah State University - Robust Cell-Level Modeling and Control of Large Battery Packs CX(s) Applied: B3.6 Date: 09/11/2012 Location(s): Utah, Colorado, Colorado, Colorado Offices(s): Advanced Research Projects Agency-Energy
(0675-1570) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques CX(s) Applied: B3.6 Date: 09/07/2012 Location(s): Missouri, C...
Measurement and Interpretation of Seismic Velocities and Attenuation in Hydrate-Bearing Sediments CX(s) Applied: A9, B2.2, B3.6 Date: 09/07/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
(0675-1594) Eaton Corporation - Predictive Battery Management for Commercial Hybrid Vehicles CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): Michigan, Minnesota, Colorado Offices(s): Advanced Research Projects Agency-Energy
Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 08/29/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory
Danger Tree Management on Green Mountain to Kremmling 69 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/15/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region