Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration
"Decommission Ground Water Monitoring Well Located on Bonneville Power Administration (BPA) Fee-owned Property CX(s) Applied: B3.1 Date: 12/14/2011 Location(s): Washington Offices(s): Bonneville Power Administration"
Modification of Metering Systems in Canby, Oregon CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Provision of Funds To The Idaho Department of Fish and Game (IDFG) To Purchase the Rapid Lightening Creek Conservation Easement CX(s) Applied: B1.25 Date: 12/01/2011 Location(s): Idaho Offices(s): Bonneville Power Administration
McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Integration of the University of Oregon’s Cogeneration Project CX(s) Applied: B1.7 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Transition the Umatilla Coho Production Program to a Local Broodstock Program CX(s) Applied: B1.20 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration