Categorical Exclusion Determinations: Bonneville Power Administration

Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration
Provision of Funds to the Colville Confederated Tribes for the Purchase of Two Parcels of Land Along the Okanogan River CX(s) Applied: B1.25 Date: 01/04/2012 Location(s): Washington Offices(s): Bonneville Power Administration