Categorical Exclusion Determinations: B4.6

Synchrophasor Based Tracking Three Phase State Estimator and Its Applications (Summary Categorical Exclusion)CX(s) Applied: B1.31, B4.6Date: 07/19/2010Location(s): VirginiaOffice(s): Electricity Delivery and Energy Reliability, National Energy Technolo...
Irvine Smart Grid Demonstration Project (Only for General Electric Work in Niskayuna, New York)CX(s) Applied: B3.6, B4.6, B5.1Date: 07/19/2010Location(s): Niskayuna, New YorkOffice(s): Electricity Delivery and Energy Reliability, National Energy Techno...
Irvine Smart Grid Demonstration ProjectCX(s) Applied: A9, A11, B3.6, B4.6, B5.1Date: 07/19/2010Location(s): Irvine, CaliforniaOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Installation of Metering Equipment at Existing Facilities for Power SchedulingCX(s) Applied: B4.6Date: 07/12/2010Location(s): Lewis County, WashingtonOffice(s): Bonneville Power Administration
Advanced Implementation of A123's Community Energy Storage (CES) System for Grid SupportCX(s) Applied: B4.6, B5.1Date: 06/25/2010Location(s): Detroit, MichiganOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
The Replacement of PacifiCorp?s Kennewick ? Dayton Hilltop Microwave Communication EquipmentCX(s) Applied: B1.7, B4.6Date: 06/22/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration
Tracy Double Breaker Double Bus ProjectCX(s) Applied: B1.23, B4.6, B4.11, B4.13, B5.2, B6.1Date: 06/11/2010Location(s): Alameda County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region
Tracy Double Breaker Double Bus ProjectCX(s) Applied: B1.23, B4.6, B4.11, B4.13, B5.2, B6.1Date: 06/11/2010Location(s): Alameda County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region
Obsidian Finance Group, LLC Generation Interconnection RequestsCX(s) Applied: B4.6, B1.7Date: 06/09/2010Location(s): Lake County, OregonOffice(s): Bonneville Power Administration
Flow Battery Solution for Smart Grid Renewable Energy ApplicationsCX(s) Applied: B3.6, B4.6, A1, B4.11Date: 06/03/2010Location(s): Albuquerque, New MexicoOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory