Compressor Testing of Next Generation Refrigeration Lubricants CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory
Severe Environment Corrosion and Erosion Research Facility CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Smart Wire Grid, Inc. - Distributed Power Flow Control Using Smart Wires for Energy Routing CX(s) Applied: A9, B1.7, B3.6 Date: 02/17/2012 Location(s): California, Missouri, North Carolina, Georgia, Tennessee Offices(s): Advanced Research Projects Age...
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: B3.6 Date: 02/16/2012 Location(s): Idaho, Illinois Offices(s): National Energy Technology Laboratory
Smart Grid Capable Electric Vehicle Supply Equipment CX(s) Applied: A9, A11, B3.6, B5.23 Date: 02/16/2012 Location(s): Kentucky, Georgia Offices(s): National Energy Technology Laboratory
Zonal Isolation Improvement for Horizontal Wells Drilling in the Marcellus Shale CX(s) Applied: B3.6 Date: 02/15/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Use of Scanning Electron Microscopy to Characterize Electrochemically Active Samples CX(s) Applied: B3.6 Date: 02/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fiberglass Pipe Pressure Cycle Testing at 723-A CX(s) Applied: B3.6 Date: 02/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Development of Cooling Towers as Non-Traditional Collectors of Particles, Biological Agents: Concentration, and Detection CX(s) Applied: B3.6 Date: 02/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office