DEQ-INL OP performs air monitoring, environmental radiation monitoring, terrestrial radionuclide monitoring, and water monitoring.…
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
The USGS proposes to update USGS gage site. The proposed action installs a radar unit to improve measurement accuracy.…
There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
The proposed project would install ten new weather stations along highways near INL.…
Project management, NEPA, site characterization,lab analyses,modeling,outreach, regional assessment, permitting; and technology transfer.…
Place an INL boundary sign every 500 feet along the 33-mile northeast cornerboundary and restore a trespasser-damaged canal.…
Continuous characterization of DFS CO2 storage complex…
Drill Stratigraphic Test Well, associated water well, and 120k ton CO2 injection to test formation activity.…
Award Number: DE-IE0000128, CX(s) Applied: A9, B3.1, Office of Indian Energy, Location(s): AZ, Office(s): Golden Field Office