BPA proposes to fund the Yakama Nation to contract Wildlands, Inc. to install three piezometer wells along the alignment of a proposed channel alo…
The scope of this project is to characterize a limited portion of the Stormwater Drain System (Solid Waste Management Unit (SWMU No. 55).
Laser sensor mounted on culvert to measure stream flow at A-11 Outfall culvert.…
The purpose of this project is to install sensors in various areas of the Nevada National Nuclear Site (NNSS) for diagnostic monitoring.…
Award Number: DE-EE0009255, CX(s) Applied: A9, B3.1, B3.6, Geothermal Technologies Office, Location(s): NY, Office(s): Golden Field Office
LM is proposing a 1-day visit to the Chariot, Alaska, Site to install four institutional control (IC) markers.…
2-D and 3-D seismic surveys, controlled source electromagnetic survey, collect gravity and magnetic data. …
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, B3.1, National Renewable Energy Office, Location(s): CO, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to provide funds to the Columbia Land Trust (CLT) to work with local and regional partners to comple…
Complete detailed characterization of Kemper County Energy Facility storage complex (Drill 3 charac. wells, perform 3D seismic, obtain UIC Class VI…