Replace old method of estimating flow by installing a flow meter with velocity sensors at the H-12 Outfall.…
Drilling, coring, logging and fluid sampling of stratigraphic (characterization) test well with plans to utilize as monitoring well.Perforate strat…
Methane measuring-both direct and airborne monitoring-will be conducted at multiple wellsite locations throughout different oil and gas producing r…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
Replace the old monitoring system with new technology (laser flow sensor) at the H-02 Outfall.…
BPA proposes to fund the Yakama Nation to contract Wildlands, Inc. to install three piezometer wells along the alignment of a proposed channel alo…
The scope of this project is to characterize a limited portion of the Stormwater Drain System (Solid Waste Management Unit (SWMU No. 55).
Laser sensor mounted on culvert to measure stream flow at A-11 Outfall culvert.…
The purpose of this project is to install sensors in various areas of the Nevada National Nuclear Site (NNSS) for diagnostic monitoring.…
Award Number: DE-EE0009255, CX(s) Applied: A9, B3.1, B3.6, Geothermal Technologies Office, Location(s): NY, Office(s): Golden Field Office