BPA proposes to fund the continued operations and maintenance (O
Admin, office and project mgmt activities; computer modeling, simulation analysis, data analysis, engineering and design of field instrumentation; …
Provide federal funding to Ormat Nevada, Inc. to use comparative analysis to assess the effectiveness of similar stimulations in different geologic…
Install solar panel and grounding rod and upgrade monitoring equipment at A-01 Outfall sampling house.…
Oil needs to be sampled to determine waste disposition.…
Work will consist of conducting a pilot test involving the installation of interval control valves (ICVs) into existing horizontal injection well.…
Install and maintain four permanent aerial survey quality control monuments and perform aerial surveys
This revision identifies the change in the power sources at the location on the T-3 road and adds two new sampling locations. …
Observe install of fiber optic wellbore array, field deploy of SASSA array, and field deploy of InSar reflector stations.…
BPA proposes to fund the assessment of resident fish species known to exist above Grand Coulee and Chief Joseph dams.…