Project management, NEPA, site characterization,lab analyses,modeling,outreach, regional assessment, permitting; and technology transfer.…
Place an INL boundary sign every 500 feet along the 33-mile northeast cornerboundary and restore a trespasser-damaged canal.…
Continuous characterization of DFS CO2 storage complex…
Drill Stratigraphic Test Well, associated water well, and 120k ton CO2 injection to test formation activity.…
Award Number: DE-IE0000128, CX(s) Applied: A9, B3.1, Office of Indian Energy, Location(s): AZ, Office(s): Golden Field Office
Front-End Engineering & Design (FEED) study on the addition of a post-combustion carbon capture system onto an existing power plant fueled by North…
At each candidate site for a possible new commercial reactor, DOE proposes to install a 60-meter high lattice or pole meteorological tower, includi…
U.S. Department of Energy, DOE, Office of Legacy Management, LM, is proposing to conduct coring and well installation using a Geoprobe followed by …
EERC will assist Minnkota with site chracterization through the installation of a deep characterization well and two associated water monitoring we…
The EEC was revised to include the United States Forest Service, USFS, the design and installation of the access roads and turn around points to tw…