The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
Repair fire/water damage in the high-bay area and portions of the attic and roof in Building 28.…
713-N Install new exit signs.…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing substations and swit…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing offices in five stat…
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
MSA/HMIS to perform installation of, or improvements to, equipment for personnel safety and health (including, but not limited to, eye washes, safe…
Bonneville Power Administration (BPA) proposes to fund ODFW to implement a habitat enhancement and wood placement project at their Flight’s End wil…
Demolish current flooring, remove old fixtures/utilities, install new flooring, install new HVAC system, install new fire suppression system, and i…
Purchase, install and operate two modular office units located within the Idaho Nuclear Technology and Engineering Center (INTEC) Facility.…