Sub-recipient will install a new wet pipe fire sprinkler system and an additional water supply connection in Units 1,2, and 3 mezzanine and ground …
This Categorical Exclusion Determination (CXD) addresses specific activities which can be performed at locations associated with Pantex Plant perta…
A Decontamination Trailer will be installed in K-Area to address any potential for a multiple personnel contamination event under Surplus Plutonium…
The U.S. Department of Energy (DOE) proposes to construct a Cryomodule Repair and Maintenance Facility (CRMF) at SLAC National Accelerator Laborato…
The scope of the Knolls Laboratory Building Q34 Construction Project includes the construction of an approximate 5,000 square foot equipment maintenance facility.
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform installation of, or improvements to, equipment for personnel safety a…
Utilize an existing lab space to create a hub for battery manufacturing research and education.…
Data collection will occur at a firing range. A minimum of 30-50 audio signatures will be collected for each type of firearm to ensure adequate rep…
Purpose: To ensure the safety and reliability of the bulk electric system.…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…