Preliminary Real Estate Plan for KCNSC New Mexico Operations’ Craddock D Facility …
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
Remodel the 1st and portions of the 2nd floors of B17 East Wing to provide updated offices with new furniture, doors, and fire suppression system, …
The Tritium facility requested a laundry washer and dryer to be installed in 719-H.…
The NRAD North Radiography Station, NRS, ventilation system is currently out of service due a failed fan. …
Purchase, install and operate a portable restroom trailer unit located within the Idaho Nuclear Technology and Engineering Center (INTEC) Facility.…
A Bicron Automated Scrap Monitoring, ASM, system will be installed and operated at 713-3N.…
There is a need for easier access to the 234-H Heating and Ventilation, H and V, elevated platform. Stairs will be added to the H and V platform.…
There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
717-8N and 717-9N Public Address System Installation…