The scope of the Naval Reactors Facility (NRF) Control System Upgrades/Modifications to the Cask Shipping and Receiving Facility (CSRF) to Support the Buffering of M-290 Shipping Containers with A1G Spent Nuclear Fuel Assemblies Project covers temporary control system upgrades and modifications at the CSRF so the facility can operate as a radiological facility to support unloading A1G spent nuclear fuel assemblies from M290 shipping containers, and repackaging of the fuel assemblies into canisters and protective overpacks for temporary storage (i.e., buffering) until the fuel assemblies can be processed at a later date in the Naval Spent Fuel Handling Facility.
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform installation of, or improvements to, equipment for personnel safety a…
Remodel to provide new plumbing, electrical, HVAC, fire protection, egress, asbestos remediation, and historic windows.…
Remodel to provide new plumbing, electrical, HVAC, fire protection, egress, asbestos remediation, and historic windows.…
The new work consists of selective demolition and installing new components to bring the NETL Site Emergency Showers and Eyewashes into compliance …
LM is proposing to conduct administrative actions, routine operations, and maintenance activities at the Tuba City, Arizona, Disposal Site.…
Remodel B34 to provide updated laboratory spaces and new infrastructure, including new HVAC, fire suppression/alarming, plumbing, electrical power,…
Provide improvements to the site main entry to the site, including driveway widening, replacement of sidewalk and curbs, additional parking spaces,…
The Proposed Activity is for E-DCF-H-09750 to add an extension to the ARM-8 detector in 264-2H Cask Receiving.…