There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
717-8N and 717-9N Public Address System Installation…
Three of the four gloveboxes are in need of modifications to enable regular helium leak checks by plumbing helium from the existing helium distribu…
Apply covering to wall at dress out station in Building 772-F.…
The Mission Support Contractor (MSC) and its subcontractors perform installation of, or improvements to, equipment for personnel safety and health …
Install conduit, wiring, and receptacles for Exit and Emergency lights in Building 789-B.…
This NEPA document would be considered an "umbrella" document for Pantex Plant projects pertaining to safety, health, and environmental improvement…
Since during operation of the 105-K KIS Vault uses compressed gas nitrogen and carbon dioxide as part of the process, potential gas leakage and asp…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
Build a self-supporting metal structure with electrical charging stations & safety eye washes to centralize the charging of the site forklifts & ma…