BPA Idaho Falls District 2015 Wood Pole Replacement and Access Road Maintenance CX(s) Applied: B1.3Date: 04/02/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Electrical Operations Staff to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3Date: 04/02/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Site-Wide Routine Maintenance Activities, 2015 Update CX(s) Applied: B1.3Date: 03/31/2015 Location(s): New YorkOffices(s): West Valley Demonstration Project
Operations, Maintenance, Repairs, Modifications, and Ongoing CERCLA Remedy-Related Actions and Site Facility Support Activities for the Monticello, Utah, Sites CX(s) Applied: B1.3, B1.11, B1.24, B1.26, B1.33, B2.5, B3.1, B6.1Date: 03/31/2015 Location(s...
Subcontractor Will Provide Roof Repairs at 773-A; E-131, E-133 CX(s) Applied: B1.3Date: 03/31/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Section E B Block Cell Exhaust (CE) Fans CX(s) Applied: B1.3Date: 03/30/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Lower Monumental-Hanford #1 Insulator Project CX(s) Applied: B1.3Date: 03/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Teec Nos Pos Communications Tower Road Maintenance Apache County AZ CX(s) Applied: B1.3Date: 03/26/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region
Install a Metal Awning at 703-1B Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 702-1C Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office