Deering Lake Eckley 115 Kilovolt Transmission Line Structure Replacements Washington and Yuma Counties, CO CX(s) Applied: B1.3Date: 05/01/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Dismantle and Remove Abandoned 773-A D-Wing Roof HVAC Equipment CX(s) Applied: B1.3Date: 04/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 703-B, A-79 CX(s) Applied: B1.3Date: 04/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Redmond-Pilot Butte #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 04/29/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Poncha-Canon West-Midway 230 Kilovolt Transmission Line Vegetation Management El Paso, Pueblo, Fremont and Chaffee Counties CO CX(s) Applied: B1.3Date: 04/29/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Clear Debris and Fallen Timber From Rows at the Sanitary Sludge Application Site CX(s) Applied: B1.3Date: 04/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
B-Area Sediment/Detention (Administrative Outfall B-11) Pond Removal and Sediment/Detention (Permitted Outfall B-10) Pond Maintenance CX(s) Applied: B1.3Date: 04/27/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Oregon City Station Service Replacement CX(s) Applied: B1.3Date: 04/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Magnetic Mountain Microwave Tower Access Road Maintenance Rio Blanco County, CO CX(s) Applied: B1.3Date: 04/27/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Flaming Gorge-Vernal #1 138 Kilovolt Transmission Line Vegetation Management and Herbicide Treatments Uintah and Daggett Counties UT CX(s) Applied: B1.3Date: 04/27/2015 Location(s): UtahOffices(s): Western Area Power Administration-Rocky Mountain Region