Subcontractor Will Provide Roof Repairs at K Reactor (918 Fan Room) CX(s) Applied: B1.3Date: 02/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
CY 2015 Removal and Replacement of High Efficiency Particulate Air (HEPA) Filters at the WIPP Facility CX(s) Applied: B1.3Date: 02/25/2015 Location(s): New MexicoOffices(s): Carlsbad Field Office
Calendar Year 2015 Removal and Replacement of High Efficiency Particulate Air (HEPA) Filters at the WIPP Facility CX(s) Applied: B1.3Date: 02/25/2015 Location(s): New MexicoOffices(s): Carlsbad Field Office
Poncha-Canon West-Midway Fiber Optic Addition El Paso, Pueblo, Fremont and Chaffee Counties, CO CX(s) Applied: B1.3Date: 02/25/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Animas River Substation Storm Drain Repair Project, La Plata County, CO CX(s) Applied: B1.3Date: 02/24/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Install Oil Separator on Condensing Unit (CDU 700) CX(s) Applied: B1.3Date: 02/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 702-K CX(s) Applied: B1.3Date: 02/24/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Kayenta-Navajo 230 Kilovolt Transmission Line Insulator Replacement Navajo County AZ CX(s) Applied: B1.3Date: 02/24/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region
LIBS, Laser Ablation, Glow Discharge Studies CX(s) Applied: B1.3Date: 02/23/2015Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Maintenance Clean the Big Hill Raw Water Intake Structure Pump Bay (GH-OM-1167) CX(s) Applied: B1.3Date: 02/23/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office