SWMF Modifications to Perform Lay Up of TVEF/MWPF.…
Remove the Inert Metallography Laboratory Tritium Recovery System (IML TRS) process chiller from service by providing air gap isolation of the chil…
The Inert Metalography Laboratory, IML, Tritium Recovery System, TRS, is no longer operational and permanently out of service.…
Remove the Inert Metallography Laboratory Tritium Recovery System, IML TRS, process chiller from service by providing air gap isolation of the chil…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
Air gapping of mechanical lines to isolate building 236-H.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
"The modification is being implemented to support the ""Layup"" plan to safely isolate or remove Structures, Systems, and Components (SSCs) no long…
Remove pressure relief valve H-284000-DW-PSV-001 on water heater located inside Building 284-H. Water heater is to be abandoned in place.…