Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
This NEPA review would address the demolition and disposition of Building 12-001A.…
This amendment would address the surface cleaning, survey, and relocation of a Radiation and Physical Inventory Pallet (RPIP) to Waste Operations D…
The Decontamination and Decommissioning Projects Contracted by the Naval Nuclear Laboratory will
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
This project would address the demolition and disposition of Buildings 12-011 and 12-011A. …
This project would review the demolition and disposition of Pantex Ramp 11-R-016 and Facility 16-010B.…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling.…
Rainwater has entered C-Area and collected in sump 216-C. Due to the nature of the former processes in C-Area the water is anticipated to be tritia…
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to do a general cleanout of the Tuba City, Arizona, Disposal Site…