Remove the Inert Metallography Laboratory Tritium Recovery System, IML TRS, process chiller from service by providing air gap isolation of the chil…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
Air gapping of mechanical lines to isolate building 236-H.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
"The modification is being implemented to support the ""Layup"" plan to safely isolate or remove Structures, Systems, and Components (SSCs) no long…
Remove pressure relief valve H-284000-DW-PSV-001 on water heater located inside Building 284-H. Water heater is to be abandoned in place.…
HB-Line will be entering Lay-Up status. The Process Air (PRA) system for HB-Line will not be needed to support the facility while in this configura…
This activity is for completing deactivation of the 236-H By-Product Facility. This facility includes the retired Burst Test Process, the He-3 Puri…
The purpose of F-DCF-H-00743 is to create an “Electrical Airgap” between Buildings 234-H and 236-H. Fire alarm and detection equipment within Build…