Isolate electrical power, generator power and utilities, steam, water, air, to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
CH2M HILL Plateau Remediation company (CHPRC) and its subcontractors perform actions that are required for the disconnection of utility services (i…
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
The Mission Support Contractor (MSC) and its subcontractorsperform activities that are required for the disconnection of utility services (includin…
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
The scope of the Waste Processing (WP) Building Demolition and Site Restoration project includes removal and disposal of the building, slab...