The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing offices in five stat…
The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform actions that are required for the disconnection of utility services. …
MSA/HMIS to perform installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, elect…
Oregon State University proposes to develop an experimental database of progressive benchmarks with increasing complexity, to be able to validate s…
Isolate electrical power, generator power and utilities, steam, water, air, to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …