Retire the 234-H Breathing Air System.…
J-Building Cryogenic Liquid Bulk Tank Replacement Project
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing substations and swit…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing offices in five stat…
The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform actions that are required for the disconnection of utility services. …
MSA/HMIS to perform installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, elect…
Oregon State University proposes to develop an experimental database of progressive benchmarks with increasing complexity, to be able to validate s…