This project is part of the Excess Facilities Disposition Program (EFDP) portfolio, which includes the disposition of Building 12-063 Complex (Buil…
Modify the 511-S Steam System to an Out of Commission Configuration.…
The purpose of the Knolls Laboratory Steam and Condensate Upgrade Project (Project) is to replace significant portions of the existing steam and condensate distribution system that are beyond their useful service life, vulnerable to service disruptions an
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
The US Department of Energy (DOE) proposes to demolish and remove Buildings 56 and 64 from the Lawrence Berkeley National Laboratory (LBNL or Berke…
National Nuclear Security Administration (NNSA)’s proposed action is to de-inventory, deactivate, decommission, and perform limited pre-demolition …
National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine administrative actions, training exercise…
The scope of the FSVTL and SVTF support facility project includes the construction of a multistory building extension to the north and/or west of the existing SVTF.
The scope of the project includes modifying the current electrical system to manage the electrical loads more efficiently.