The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
Remove steam line feeding 294-F. 294-F is out of service and does not require steam. The steam header to 294-F is out of service and air gapped on …
Isolation of Steam Facilities east of F-Canyon.…
Incoming 13.8kV and 125VDC power to 784-A switchgear is to be removed.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform activities that are required for the disconnection of utility service…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform actions that are required for the disconnection of utility services (includi…
The scope of work includes reconfiguring the space for the new use, upgrading the HVAC system, the electrical, lighting systems, and the telecommunication system.
Bonneville Power Administration (BPA) proposes to authorize Zayo Fiber, LLC (Zayo) to decommission BPA-owned fiber optic facilities installed for t…
This NEPA review would address the demolition and disposition of Building 12-001A.…
The Decontamination and Decommissioning Projects Contracted by the Naval Nuclear Laboratory will
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building