This project would review the demolition and disposition of Pantex Ramp 11-R-016 and Facility 16-010B.…
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to do a general cleanout of the Tuba City, Arizona, Disposal Site…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
Prior to D and D, the INL Fire Department will use MFC-713 for a simulated building fire and subsequent training exercises.…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform actions that are required for the disconnection of utility services (includi…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform activities that are required for the disconnection of utility service…
Bonneville Power Administration (BPA) proposes to authorize Zayo Fiber, LLC (Zayo) to decommission their In Line Amplification (ILA) facilities on …
Rev 6-Domestic water isolations to support D and D of 235-F will require a Site Clearance permit.…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…