Bonneville Power Administration (BPA) proposes to authorize Zayo Fiber, LLC (Zayo) to decommission their In Line Amplification (ILA) facilities on …
Rev 6-Domestic water isolations to support D and D of 235-F will require a Site Clearance permit.…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…
The U.S. Department of Energy (DOE) proposes to demolish non-Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) facilities and structures remaining at the Oak Ridge National Laboratory (ORNL) and conduct a general...
Isolate the hazardous energy in southern portion of 735-A, C-Wing.…
This activity involves the removal of piping associated with the abandoned surge tanks along the River Water Pumphouse Distribution System.…
The primary purpose of the Building Q3 Dismantlement Project is to remove the existing building to accommodate the construction of a new multi-story office building, along the eastside of the Knolls Laboratory, Building Q3.
The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…
Bonneville Power Administration (BPA) proposes to authorize Zayo Fiber, LLC (Zayo) to remove existing fiber optic equipment at BPA’s fee-owned Rave…