"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F.…
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
The scope of the Waste Processing (WP) Building Demolition and Site Restoration project includes removal and disposal of the building, slab...
Remove 252-9H Substation northwest of Building 232-H in the Tritium facility. …
Disconnect and remove electrical cables and fuses from 125V Distribution System in 108-2L.…
Activities addressed by this standard NEPA Review Form include: Routine maintenance and repair activities, Plant rearrangements and/or building mo…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F. Ve…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing facilities in five stat…
The U.S. Department of Energy proposes projects to remediate and restore the Bayview Planning Area Parcel 1 (the Bayview Parcel 1 Cleanup Project) …