This EEC covers the demolition of 54-39G wait station shed.…
Routine Operating and Administrative Activities (ROAA)-NCR: KCNSC23-01.…
This amendment would address the surface cleaning, survey, and relocation of a Radiation and Physical Inventory Pallet (RPIP) to Waste Operations D…
The Decontamination and Decommissioning Projects Contracted by the Naval Nuclear Laboratory will
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
Decommissioning and Demolition of 100 Area coal yard Buildings 115 and 116 including equipment and structures conveyance of materials.…
Decommission and removal of IPNS pre-accelerators and 50MeV LINAC. Includes removal of vacuum and cooling systems. Isolation and termination of bui…
The proposed activities would include characterization of the facilities, followed by demolition. Demolition would be performed in Areas 12 and 23.…
The Modular Office Building T-13 (MFC-713) will be demolished and disposed (D and D) in the Spring/Summer of 2023 in preparation for utility realig…
This project would address the demolition and disposition of Buildings 12-011 and 12-011A. …
This project would review the demolition and disposition of Pantex Ramp 11-R-016 and Facility 16-010B.…