All activities will occur within areas previously disturbed by construction and operation of WAPA and Basin Electric Coop facilities.…
Revision 1: Dismantlement and Removal (D and R) of the Electrostatic Precipitators and connections attached to the 484-D Powerhouse…
The Proposed Activity is to remove both of the stack pipes for 782-5M and 782-6M soil vapor extraction units for both safety and cost savings.…
This EEC supports activities post Cold and Dark status of Building 235-F.…
702-1C AT and T 5ESS Network cabinet disassembly and removal.…
Ownership of the Radiation Research Building, currently owned by the Department of Energy (DOE) and located on the UND campus, would be transferred…
Because the Caustic Feed Tank Cold Sampler (S329-010-088-00-S) is no longer needed, all the sampler equipment can be removed.…
A number of Salt Waste Processing Facility Temporary Buildings are to be dispositioned since they are no longer needed. The purpose of this EEC is …
Restroom trailer 773-71A, built in 1993, 478 square feet, will have services disconnected, and the trailer will be removed to the SRSCRO N-realaydo…
The U.S. Department of Energy (DOE) proposes to demolish non-Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) facilities and structures remaining at the Oak Ridge National Laboratory (ORNL) and conduct a general...