The U.S. Department of Energy (DOE) proposes to install a temporary tensile (tent-like) structure on the existing demolished Building 7 site to pro…
HMIS Annual Categorical Exclusion (CX) B1.23, Demolition and Disposal of Buildings for CY 2022…
Demolition and Removal of Admix System…
The Kesselring Site Southeast Quadrant Decontamination and Dismantlement Project will remediate, dismantle, and dispose of above and below grade structures and utilities associated with Building 5, Building 5A...
The scope of the Knolls Laboratory General Plant Project funded-Legacy Radio Replacement Project is to replace an aging radio system with a new two-way radio system, which includes an electrical tie-in to an existing emergency power generator.
Remove out-of-service steam line section near 717-A.…
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
Princeton Plasma Physics Laboratory (PPPL) has developed a long-term initiative to make mission-critical improvements to offices and lab facilities…
This activity covers the preparation (putting buildings and structures in a cold and dark state) and the demolition of buildings and structures in …
BPA proposes to fund Washington Department of Fish and Wildlife (WDFW) for the removal of a house, outbuildings, and debris at the existing Chinook…