The system will be upgraded, fully replaced, or enhanced.
Dismantle and Remove (D and R) all equipment comprising the Low Level Waste Handling Station…
Six degraded trailers SRS-PB-01030, SRS-PB-01032 (776-12A), SRS-PB-01033 (776-13A), 774-23A, 774-4A, and 774-5A known to contain asbestos containin…
This project would replace identified equipment within the existing Building 12-123 Complex Compressed Air System with new equipment to meet the co…
Trailers 241-119H and 241-120H will be demolished and replaced with new trailers.…
The primary purpose of the Building Q3 Dismantlement Project is to remove the existing building to accommodate the construction of a new multi-story office building, along the eastside of the Knolls Laboratory, Building Q3.
ATTA-Demo existing canopy and erect a new canopy.…
Installation of electric vehicle charging stations across SRS.…
The purpose of this project would be to demolish and dispose of structures and scrap material on the Nevada National Security Site (NNSS) that have…
The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001