The project will modify the physical facilities at BLS.
Relocate and Demolish N-Area Trailers.…
The Knolls Laboratory (Site) Security Upgrade Major Construction Project (Project) encompasses the installation of various upgrades to Site security buildings and infrastructure that is over 65 years old. The upgrades will improve Site physical security and operational efficiency. Existing security infrastructure and buildings will be remediated and demolished as part of the Project.
The Utility Infrastructure Project (UIP) includes improvements to sitewide utilities to support Fermilab's mission over the next 40 years.…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Medford, MA, for the installation o…
The Naval Reactors Facility Transporter Transfer Path General Plant Project will replace the existing hydraulic lifting machine transfer pathway with a new transporter transfer path.
CF-638 and PBF-632 are two buildings that have fallen into disrepair. As a result, and in anticipation of potential future campus development proje…
The project will be the complete physical demolition of Buildings 321, 412 and 728M.…
Remove and dispose of temporary buildings 724-48E and 724-49E near the TRU Pads (15-19) in E Area. Move 701-18A from A-Area and install 701-18A in …