The Kesselring Site Perimeter Roads Maintenance Project will rehabilitate approximately 11 miles of the Kesselring Site Perimeter Roadway System to include 6 miles of the perimeter loop road and 5 miles of spur roads.
Activity is to replace the current trailer 782-3G with a new trailer in approximately the same location.…
MFC-768E is located almost directly in the path of the replacement of underground potable/fire water piping project (ERPNo. 3335). The building ne…
LM is proposing to conduct non-remedy-related routine and non-routine activities associated with the maintenance and ongoing management of the Rock…
Dismantle and dispose of two Handi-Houses No. SRS-PB-00685 and SRS-PB-00698 F-Retention Basin…
High winds from a recent storm damaged a shed behind the 263-242F quonset hut. The Buildings, Grounds, and Maintenance group will be demolishing th…
Purpose: To ensure the safety and reliability of the bulk electric system.…
This EEC supports activities post Cold and Dark status of Building 235-F. Revision 6 includes work in 701-1F, 720-F, 252-9F, and removal of perimet…
Kansas City National Security Campus (KCNSC) and New Mexico Operations (NMO) – Routine Operating and Administrative Activities (ROAA)…
Chemical addition components on the north wall of 780-2A are abandoned and no longer functional. Remove electrical feed to abandoned junction boxes…