This EEC covers the asbestos removal and demolition of handi-houses located in laydown area south of N-Area.…
Activities involving final deactivation and decommissioning (D and D) of multiple D-Area buildings. This revision incorporates the adding of demoli…
NEPA action levels for planned changes as defined in the Internal Procedure (IP001) - How to Comply with the National Environmental Policy Act (NEP…
The purpose of the demolition of Site 50, 52, and 55 houses at Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL, is to reduce excess…
The project will be the complete physical demolition of ST0690. ST0690 is a 6,000 square foot wood structure constructed in 1991. The facility does…
Bonneville Power Administration (BPA) proposes to relocate an existing fuel island and truck scale in the East Warehouse Yard at the J.D. Ross Subs…
The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
Design, installation, and operation of a iron-air multi-day storage system: which would include: site grading and temporary construction facilities…
BPA proposes to demolish an aging 12.5kV control house and replace a 48VDC control voltage breaker. The new breaker would work with the 130VDC batt…
The F Tank Farm facility requires the replacement of RADCON trailer 241-24F. The trailer is aged and needs to be replaced to enhance work related a…