UPC sub-contractor to remediate asbestos before demolishing and removing (2) unused Handi-Houses to the C and D Landfill from the HY1 Laydown Yard.…
Naval Nuclear Laboratory will be contracting to perform Decontamination and Decommissioning (D and D) Projects (Task Order No. 2) to remediate, dismantle, and dispose of select above grade structures and select components associated with Building 19 (S3G Plant Support/Interactive Display Equipment (IDE) Building), Building 20 (Equipment Service Building), Building 21 (Fuel Service Building), Building 80A and 80B (M-140 Complex), and Pad 90 (MARF Reactor Access Enclosure).
The scope of the Knolls Laboratory Building Q34 Construction Project includes the construction of an approximate 5,000 square foot equipment maintenance facility.
TRA-620 and ARA-750 are buildings that have fallen into disrepair. As a result, and in anticipation of potential future campus development projects…
The purpose of this project is to demolish and dispose of structures, debris, and buildings that have no further use at the Nevada National Securit…
Revision 2: There are 12 total transformers, three on each of the 4 Precipitators. Through drone flights, we were able to verify the 12 transformer…
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.
The CMOSS Switchgear Electrical Power Upgrade and BMOSS Refeed Project supports shifting electrical loads due to current construction activities, future electrical capacity expansions, and upgrades various aspects of the power distribution system.
Remove/demo shuttle shelter 54-17G located in the parking lot of 731-N. …
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform demolition and subsequent disposal of buildings, equipment, and suppo…