BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
The U.S. Department of Energy (DOE) is proposing to provide funding to Czero, Inc. to design, develop, fabricate, and lab test a novel modular hydr…
Remove existing ramp and replace with a similar ramp.…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
This activity includes the sampling and processing of water in cooling towers and heat injection systems at Savannah River Site for the presence of…
Aerosol DriSlide Multi-purpose Dry Lubricant will be applied to small metallic platens in a fume hood.…
703-A Install a board across broken window.…
Replace Tile Flooring, Sinks, Countertops, Toilets, General Refurbish 105-K plus 15 Men's Restroom.…
A crosswalk will be painted on the ground between 704-L and 701-1L.…
Replace existing exhaust fan on west end of building 711-N with a like-for-like replacement.…