Add Inner Canister Closure Station (ICCS) flange heater platform and remove swing arm motor and gearbox.…
Installation of isolation valve for 782-2A.…
703-43A Install handrail on south steps.…
751-1A Parking lot improvements.…
226-2F East Parking Lot-Clean and Re-Stripe.…
This modification will replace E3S components in L-Area with Argus.…
Load Center-B1 will be taken out of service for Preventative Maintenance.…
Demolition and disposition of bldg. 703-1B uninterruptible power supply.…
Rad samples are analyzed on the Rad Microtrac S3500 Particle Size Analyzer located in 773-A C-150. Non-Rad samples are analyzed on the Microtrac S3…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Pittsburgh to develop and validate new sensing and measure…