Categorical Exclusion (CX) Determinations By Date

The research performed in this laboratory includes: basic microbiology, mineral characterization, soil science, and chemical leaching. …
The main objective of this project is to replace the existing East Interconnect. This change would replace the switch house enclosure, 12.47 kV swi…