Steam pipe 3/4 in.-LS-30-3 will be cut at the pipe support after valve LS-V-360.…
Add Inner Canister Closure Station (ICCS) flange heater platform and remove swing arm motor and gearbox.…
Installation of isolation valve for 782-2A.…
703-43A Install handrail on south steps.…
751-1A Parking lot improvements.…
226-2F East Parking Lot-Clean and Re-Stripe.…
This modification will replace E3S components in L-Area with Argus.…
Load Center-B1 will be taken out of service for Preventative Maintenance.…
Demolition and disposition of bldg. 703-1B uninterruptible power supply.…
Rad samples are analyzed on the Rad Microtrac S3500 Particle Size Analyzer located in 773-A C-150. Non-Rad samples are analyzed on the Microtrac S3…