Bonneville Power Administration (BPA) proposes to rebuild three spans of the double-circuit Bell-Boundary No. 3 ꟷ Addy-Colville No. 1 transmission …
The project includes WAPA temporarily re-routing a section of its Edgeley to Forman 69 kV transmission line that collapsed into TAD lake along the …
Install water sampling equipment at stream behind SRPPF administrative facility.…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Washington to design, develop, fabricate, and test acousti…
The purpose of the proposed action is to provide a new leased Machining and Fabrication Engineering Laboratory (MFEL) that will include office spac…
The Proposed Activity (PA) is for Design Change Form (DCF) J-DCF-H-06285 to add details for an optional stand to be added to the frame holding the …
Bonneville Power Administration (BPA) proposes to upgrade, replace, and install new electrical station service and fiber optic cable networks acros…
Bonneville Power Administration (Bonneville) proposes to repurpose financial reserves to certain power uses under the Power Reserves Distribution C…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
Revision 2: There are 12 total transformers, three on each of the 4 Precipitators. Through drone flights, we were able to verify the 12 transformer…