Redesign of SLAC's main entrance to enhance safety and meet new security needs, including demolition of existing main gate guardhouse construction …
Bonneville Power Administration (BPA) proposes to modify transmission structures 7/3 to 7/7 on the 115-kilovolt (kV) Cardwell-Cowlitz No. 1 transmi…
The purpose of this project is to demolish facilities on the Nevada National Security Site (NNSS) that have no further use, allowing for the propos…
The main research activities included in this project are measurements of visible/infrared/Raman spectra of solid geological materials exposed to v…
Funding will support the project team's small-scale, research and development activities of acoustic stimulation and electrolytic proton production…
Funding will support the project's small-scale research and development of a miniaturized nuclear magnetic resonance (NMR) sensor to measure the mo…
Install new HVAC unit for Men and Women locker rooms/restrooms at 705-N. This includes installing new concrete, duct work, insulation, packaged air…
During a housekeeping walkdown it was observed that the walls, doors, and handrails at the North Dock need to be repainted.…
This EEC is for the relocation of Recycle Vessel Vent (RVV) No. 1 Fan Assembly and RVV No. 2 dampers in H-Canyon Building 292-H per MT-HCA-2021-000…
Repair and coat the chemical containment dikes in 782-3A. Revision 1 is necessary to include the rerouting of power and signal cables for the scope…