Preparation of analytical samples for TEM. Preparation of samples prior to and after fireside, steamside or air exposures. Preparation of Fluxer sa…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
The INL is supporting Holtec International's SMR-160 Advanced Reactor Demonstration Program by testing integral and separate effects test loop for …
The objective of the MFC- 793 and MFC-793C Perma-Con containment project is to provide and construct a permanent modular containment structure to…
The Cybersecurity Consortium for Innovation will enhance the energy sector's cybersecurity through specialized education, AI-driven threat monitori…
The Activity proposed by this EEC is the disposal of routine solid Low-Level Waste (LLW) and Transuranic (TRU) waste generated by performance of An…
The scope of this work is to Install a partition wall around the old communication rack at the South end of the 221-H control room.…
Remove Valve V-061 To Isolate Old Abandoned Well Water Header.…
Paint building exterior at 251-H.…