A new container loading system (CLS) will be installed on TRU Pad 4.…
The Mobile Melt Consolidation (MMC) Project components will be installed at 645-N.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the Great Plains Institute to conduct scientific field testing and m…
Bonneville Power Administration (BPA) proposes to replace marker balls between 18/1 and 18/2 on the Keller Tap to Grand Coulee-Okanogan No.2 in Fer…
The objective of this task is to measure the retention of mono-methylmercury (MM) in Saltstone cementitious grout under saturated leaching conditio…
This EEC covers various renovation activities for Building 703-41A.…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
784-7A Boiler No. 2 Retubing.…
Caulking to be removed and replaced with non-asbestos caulking.…
Advanced Tactical Training Academy (ATTA) or Bobby Davis Range (BDR) changed from 40 caliber (.40 cal) to 9 -millimeter (9 mm).…