AHU No. 3 motor replace and rework at the shop No. 127 at 735-B.…
Installation of electric vehicle charging stations across SRS.…
This scope is to support the leak / low pH in the sewer drain lines leading to the H-12 Outfall. Water from standpipe will be pumped into P10B.…
Historical analysis of landfills, process design for aluminum recovery for landfill waste. Laboratory scale testing at Michigan Technological Unive…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
E-DCP-H-18007 is for the replacement of Motor Control Center (MCC)-J.…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to install, alter, and/or maintain safety and security components…
The project will develop a cutting-edge CO2 electrolyzer technology to capture flue-gas from coal-fired power plants and steel mills, ultimately co…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to install, alter, and/or maintain safety and security components…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to install, alter, and/or maintain safety and security components…