The U.S. Department of Energy (DOE) is proposing to provide funding to Littoral Power Systems, Inc. (LPS) to design, fabricate, and test the exteri…
Funding will support the project team's small-scale research and development of a hybrid electric flying testbed for integration into aircraft whic…
The Western Area Power Administration (WAPA) proposes to conduct a Phase II Environmental Site Assessment (ESA) to evaluate the extent of possible …
DOE proposes to adopt test procedures for consumer products, and commercial and industrial equipment that manufacturers of covered equipment must u…
Curio is pursuing applied research and experimental demonstrations to reduce risks and uncertainties, incorporate safeguards-by-design, and minimiz…
The backflow preventer is located in the 285-4F courtyard. A replacement is available on site and will be utilized for the repair.…
The H-Canyon Central Exhaust Fan #3 breaker failed and damaged the entire cubicle (HS-254019-ELNH-MCC-C-EC-3A). This cubicle needs to be replaced.…
Power is to be relocated for the process water well at 905-20A to be fed from the A6 feeder.…
The goal of this work is to produce novel materials using the ball milling method of alloying under different gaseous atmospheres.…
The existing 12V Group 8D Interstate batteries (Part No. 8D-MHD) will be replaced with a 12V Trojan Battery Group 8D-AGM Dual Purpose (Part No. Mot…