The Project is a rebuild of six (6), 161 kV overhead transmission lines from the Gridliance Joppa 161 kV switchyard to the TVA Shawnee Station and LGE Grahamville 161 kV substations.
Preliminary Real Estate Plans, applicable to all easements related to Building 23 (examples: electricity transmission-Evergy, natural gas-Spire, an…
This document covers the support activities of equipment rental, purchase of materials (pipe casing, etc.) and services under FFPO supervision for …
Bonneville Power Administration (Bonneville) proposes to allow applicant to remove up to two overhead lines and install up to two new underground l…
Bench-scale studies, and design, engineering, fabrication and demonstration of a first-of-a-kind (FOAK) 100-kW flow electrolyzer for simultaneous a…