Funding will support the project's small-scale research and development activities to continue refining a virtual environment platform that can sup…
Bonneville Power Administration (BPA) is proposing to address a distressed wood pole structure on the Shelton-Fairmount No. 2 transmission line at …
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of two wood pole structures (48/5 and 112/3) and associated structura…
Bonneville Power Administration (BPA) proposes to fund the Columbia River Estuary Study Taskforce (CREST) to implement a channel reconnection proje…
Southern LNG requests authorization to export this LNG in a volume equivalent to 182.5 billion cubic feet (Bcf) of natural gas on a cumulative basis for a two-year period commencing on April 1, 2023.
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
DCF and associated work order to repair the bottom of P68 manhole and raise it to grade for easier access in the future.…
The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. In Phase II, we will drill a hole in the ground and col…
The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. This involves a specialized drill rig that drills a hol…
The project seeks to advance a novel high-capacity structured sorbent (HCSS) comprising a highly dispersed sorbent with a low-pressure drop substra…