The Proposed Activity is for E-DCF-H-09750 to add an extension to the ARM-8 detector in 264-2H Cask Receiving.…
The scope of this work order is to implement C-DCF-H-04726. Construction is to replace the drip pan tubing in building 234-H Room 22 with PVC pipin…
Funding will support the project teams small-scale, research and development activities to establish publicly available open-source datasets of GHG…
The project would design, manufacture, and field test a hybrid Direct Air Capture system that would capture CO2 and water from air. This work inclu…
Lab work at UT Austin and at Columbia University. Lab work will involve sample preparation and analysis, rock mechanics experiments, and data inter…
(1) computer-based techno-economic analysis and life cycle assessment, (2) design and development of a bench-scale electrochemical reactor, (3) lab…
The Recipient will perform R and D by designing and testing a 5kg/hr carbon dioxide direct air capture (DAC) process.…
Bonneville Power Administration (BPA) proposes to correct 31 impairments along approximately 22 miles of the 115-kilovolt (kV) Grandview-Red Mounta…
CX-027713: Cascade Orchard Irrigation Company (COIC) Irrigation Efficiency and Pump Exchange Project
BPA proposes to fund the Chelan County Department of Natural Resources (CCDNR) to implement improvements to irrigation infrastructure owned and ope…
The scope of work at the Protective Force Training Complex would include administrative work, classroom training, live fire activities, mounted and…