Re-route of structures 34-5 through 35-4 of ED-FO line downed by flood. This will involve a combination of steel and wood poles on three peninsular…
This Amended Determination follows the approval of additional funds, period of performance, and new project performer (magniX USA Inc.) to support …
Bonneville Power Administration (BPA) proposes to fund the Methow Salmon Recovery Foundation (MSRF) to excavate groundwater test wells and install …
Bonneville Power Administration (BPA) proposes to install three new motor operated disconnect switches, a new bus configuration, and relaying equip…
The XRD LAb uses off-the-shelf equipment for testing samples for crystalline structure and to determine other properties related to or associated w…
Construction of a new Computational Science and Engineering (CSE) facility located in the area where B7, T43 and T45 were demolished. Facility will…
The project team plans to complete a paper feasibility study to determine the feasibility of distributed DAC with centralized injection/storage in …
2 more:Valley Onward-Merced, CA
The Bonneville Power Administration (BPA) is proposeing to continue annual funding the Washington Department of Fish and Wildlife (WDFW) for Operat…
Seal coat and restripe the parking lot at 705-A.…