Install new restroom trailer to replace existing 704-11K restroom trailer.…
A 2-ft-by-2-ft concrete pad will be installed and used as a survey monument to maintain staff gages properly at various SRS stream gage sites.…
CM 4211 Install Promabeam saw from laydown yard to 711-N. Work group to remove existing roller tables, and anchors on west side of 711-N Iron Worke…
The Plant Air System (PRA) is used to support the dry material silos.…
The expansion tank for the 218-H Chilled Water System is being replaced due to deterioration and the new model requires a minor modification of the…
LM is proposing to conduct routine inspection, monitoring, and maintenance activities at the Maybell West, Colorado, Uranium Mill Tailings Radiatio…
LM is proposing to conduct routine inspection, monitoring, and maintenance activities at the Maybell, Colorado, Uranium Mill Tailings Radiation Con…
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…
Remove wall and install a security door in 713-N.…
The US Depa1tment of Energy (DOE) is considering whether to issue a loan guarantee under the Title XVII Clean Energy Financing Program to Eos Energy Enterprises, Inc. ("EOS") for equipment reconfiguration and retooling of three manufacturing buildings, in Turtle Creek, Pennsylvania.